大发快三uu

      <b id="vnt12qd" ><center id="vnt12qd" ></center></b>

    1. <code id="vnt12qd" ><font id="vnt12qd" ></font></code>
      <noframes id="vnt12qd" ></noframes><small id="vnt12qd" ><input id="vnt12qd" ></input></small>
      <label id="vnt12qd" ></label><th id="vnt12qd" ><output id="vnt12qd" ></output></th>

      <object id="vnt12qd" ><delect id="vnt12qd" ></delect></object>
    2. Home 首页 / CORPORATE CULTURE / Company History
      Company History

        2015

      •   

        Shanghai Tianhuan Material Technology Co., Ltd. was established in Shanghai and engaged in operation of electronic grade fiberglass roving, glass fabric and industrial grade glass fabric.
      •   

        Four subsidiaries: Chongqing Tianze Advanced Materials Co., Ltd., Chongqing Tianqin Material Co., Ltd., Shanghai Tianwei Fiberglass Co., Ltd. and Zhuhai Zhubo Electronic Material Co., Ltd.

        2014

      •   

        The wholly-owned subsidiary Chongqing Tianze Advanced Materials Co., Ltd. was established in Chongqing.
      •   

        The lines F01 and F02 were started successively for re-operation.

        2013

      •   

        CPIC purchased 60% equity of CPIC Abahsain Fiberglass W.L.L. and established CPIC (Bahrain) Fiberglass Co., Ltd.
      •   

        CPIC purchased AGY Shanghai Technology Co., Ltd. and established Shanghai Tianwei Fiberglass Co., Ltd.
      •   

        CPIC SteklovoloknoLLC was established.
      •   

        CPIC purchased 60% shares of Changzhou Hongfa Zongheng Advanced Materials Technology Co., Ltd.

        2012

      •   

        The tank furnace in CPIC Brasil Fibras de Vidro Ltda. was started for re-operation after cold repair.

        2011

      •   

        2011 CPIC completed acquisition of Brazil Capivari Factory. CPIC Brasil Fibras de Vidro Ltda. was formally established, starting global strategic layout of CPIC.
      •   

        2011 CPIC established Yuanjia (China) Mining Industry Co., Ltd. as one of shareholders, starting to extend the businesses to upstream of the industrial chain.

        2010

      •   

        Annual capacity reached up to 500,000 t.
      •   

        80,000 t glass tank furnace at the line F10 was started and put into operation.
      •   

        The production line (F09) in No. 1 Branch Factory was established and started to mainly produce ECT products.

        2009

      •   

        The production line (C3B) in No. 1 Branch Factory was expanded and started.
      •   

        High-strength high-modulus environment friendly TM glass was produced.

        2008

      •   

        The second spun yarn production line (F07) at Changshou Base was started.
      •   

        Roving production line (F08) at Changshou Base was established.
      •   

        Fluoride-free boron-free environment friendly ECT glass was produced.

        2007

      •   

        Production line (F06) was started.

        2006

      •   

        The production line at Changshou Base (F04) was established and started to mainly produce electronic grade spun yarns and thermoplastic chopped strands.
      •   

        Carlyle Group made investment in CPIC.
      •   

        Production line (F05) was started.
      •   

        CPIC made investment to establish Chongqing Tianqin Material Co., Ltd. engaged in R&D, production and sales of glass fabric, starting to extend the businesses to downstream of the industrial chain.

        2005

      •   

        Production line (F03) was started. This was the world's largest ECR production line independently designed by CPIC and filled in the gap of China in \""ECR\"" fiberglass.

        2004

      •   

        CPIC purchased Chongqing Fiberglass Factory.
      •   

        CPIC passed the certification on ISO1400 and OHSAS18001 systems
      •   

        Chongqing Tianwei New Materials Co., Ltd. was merged.
      •   

        A foundation was laid at Changshou Base.

        2003

      •   

        Production line (F02) was started.

        2002

      •   

        Production line (F01) was started.
      •   

        CPIC’s management organization entered new factory area in Zone B of Jianqiao Industrial Park.

        2001

      •   

        Saudi Arabian Amiantit Co., Ltd. became a shareholder of CPIC and held 21% equity.

        2000

      •   

        CPIC passed the certification on ISO9001 system.

        1999

      •   

        Chongqing Fiberglass Factory transferred such shares to Yuntianhua, and then Yuntianhua became the biggest shareholder of CPIC.

        1991

      •   

        CPIC was established, and Chongqing Fiberglass Factory held 70% shares.

        1986

      •   

        The first production line for fiberglass tank furnace with direct method in China was introduced.

        1985

      •   

        Chongqing Fiberglass Company was established.

        1973

      •   

        Chongqing Fiberglass Factory was put into operation.

        1971

      •   

        Chongqing Fiberglass Factory was established.

      

      Corporate headquarters

      Add:Jianqiao Industrial Park B,Dadukou District Chongqing,China
      Tel:86-023-6大发快三uu
      Fax:86-023-68157822

      changshou

      Add:Qixin Road No. 25,Economic and Technological Development Zone of Changshou District,Chongqing
      Tel:86-023-6大发快三uu
      Fax:86-023-68157822
        <b id="vnt12qd" ><center id="vnt12qd" ></center></b>

      1. <code id="vnt12qd" ><font id="vnt12qd" ></font></code>
        <noframes id="vnt12qd" ></noframes><small id="vnt12qd" ><input id="vnt12qd" ></input></small>
        <label id="vnt12qd" ></label><th id="vnt12qd" ><output id="vnt12qd" ></output></th>

        <object id="vnt12qd" ><delect id="vnt12qd" ></delect></object>